top of page
AA50BCA6-48E2-49B2-80D6-20752E92614A_edi
production schedule.jpg
storyboard.jpg
storyboard 2.jpg

New Story Board

Risk Assessment

No major Risks.

Hazards

1). Burning yourself on boiling water

2). Broken mugs/ceramics

3).Tripping over a camera stand

4).Slippery surface

Who's exposed?

1). All cast

2). All cast

3).All cast

4). All cast

 

Risk

1). Low to medium

2). Low to medium

3). Low to medium

4). Low to median

 

Control measures

1). Be careful when making Tea/using the kettle.

     I have a first aid kit at hand

     My dad is trained in first aid

     QEH- nearest hospital with a&e

 

2).Be careful handling the crockery

     I have a first aid kit at hand

     My dad is trained in first aid

     QEH- nearest hospital with a&e

 

3).Make sure the camera stand is out of the way when not being used.

    Tell the cast to be careful around the equipment

 

4).Wipe surface before filming

     Clean up as soon as something is spilt to avoid anyone falling over.

 

 

Risk

1). Very low/ low

2). Very low/low

3). Very low/low

4). Very low/low

new doc 2019-11-25 16.09_edited.jpg
new doc 2019-11-25 16.36.28_2.jpg
new doc 2019-11-25 16.36.28_2 (1).jpg
bottom of page